LATEST DATA
GLOBAL WIND + SOLAR SHARE 18.4% +2.1 PP YOYGLOBAL CLEAN ELECTRICITY 41.2% POWER DEMAND +3.0% YOYCLEAN ENERGY EQUITIES ICLN $17.36 +0.35%TAN $48.15 +1.24%FAN $23.68 +0.27% POWER · EMBER EQUITIES · DELAYED
← BACK TO HOMENEWS / ENERGY GRID
grid Electromontaj
NEWSENERGY GRID 2 MIN READ

Electromontaj Wins Tender for the Construction of the 400 kV Gădălin–Suceava Overhead Power Line

Electromontaj is proud to announce that it has won the tender for the construction of the 400 kV Gădălin–Suceava overhead power line, a strategic project of national significance for Romania that will strengthen and modernise the country’s electricity transmission network.

Spanning approximately 260 kilometres, the high-voltage line will traverse the Eastern Carpathian Mountains, connecting 40 localities across the counties of Cluj, Bistrița-Năsăud, and Suceava.

Project Overview

The project includes:

  • Installation of 998 high-voltage pylons;
  • Mounting of three phase conductors and two protective conductors;
  • Expansion of the 400 kV Gădălin and Suceava substations.

Strategic Importance

This new overhead power line plays a major strategic role, as it will complete the national 400 kV ring of Romania’s Electric Transmission Network, making a substantial contribution to
enhancing the safety and flexibility of the National Energy System,
reducing transmission losses across the network, and
ensuring a reliable and sustainable electricity supply for consumers.

Winning this tender represents yet another recognition of Electromontaj’s expertise and capabilities in delivering complex energy infrastructure projects, reinforcing its position as a leader in energy construction in Romania.

Towards the Capital Market

In parallel, the company is taking a significant step towards the capital market. Between 3–16 October 2025, the EM Group, which includes Electromontaj, will launch a public offering of shares, brokered by TradeVille.

Any investment decision within this Public Offer should be based solely on the Prospectus available to the public. The document provides comprehensive details about the issuer, the terms of the offer, the characteristics of the shares, and the associated risk factors.

It is important to note that investing in shares carries inherent risks, including the potential loss of part or all of the invested capital, as well as exposure to volatility and liquidity risks. These risks are clearly outlined in the relevant sections of the Prospectus and must be carefully reviewed to make an informed investment decision.

Derek Michalski

ABOUT THE AUTHOR

Derek Michalski

The Voice of Renewables editorial team reports on the policies, projects, technologies and people shaping the global energy transition.

VIEW AUTHOR ARCHIVE

MORE FROM ENERGY GRID

THE LATEST SECTOR COVERAGE

DEEP DIVE

Thirty Minutes to Three: What’s Really Behind the Self-Healing Grid’s Speed Claims

10 SEP 2026 · 5 MIN READ

NEWS

Greece Licensed 67 GW of Batteries. The Grid Can Take About 7.

10 SEP 2026 · 4 MIN READ

NEWS

HEDNO’s Smart Meters Were Never Really About Billing

10 SEP 2026 · 4 MIN READ

DEEP DIVE

Millions of Euros, Four Minutes: Inside the Algorithms Rewiring the Control Room

10 SEP 2026 · 5 MIN READ

NEWS

TenneT Netherlands prices EUR 2.5 billion dual-tranche Green Bond issuance

3 SEP 2026 · 3 MIN READ

NEWS

Lithuania Accelerates Underground Cabling in Municipalities Hosting Military Training Grounds

3 SEP 2026 · 3 MIN READ

NEWS

Ukraine’s Parliament Passes Law Implementing EU Renewable Energy Rules

3 SEP 2026 · 3 MIN READ

NEWS

A Hacker and a Typo Can Now Do the Same Amount of Damage to a Substation

2 SEP 2026 · 5 MIN READ

NEWS

The Small Box That’s Quietly Replacing Miles of Substation Copper

2 SEP 2026 · 5 MIN READ

NEWS

The Grid Needs 50% More Investment by 2030. Utilities Think Less Copper Is Part of the Answer.

2 SEP 2026 · 6 MIN READ

DEEP DIVE

Grid-Forming Inverters: The Quiet Shift Rewriting Europe’s Grid Engineering

31 AUG 2026 · 15 MIN READ

NEWS

The Meshed Offshore Grid: a Hardware Story and a Harder, Quieter One

29 AUG 2026 · 6 MIN READ

NEWS

UK grid storage start-up Certain Energy lands £10m as curtailment bill nears £8bn

28 AUG 2026 · 3 MIN READ

NEWS

Cost Causation in the Age of Hyperscale Demand: How Europe Is Rewriting Grid Access and Network Tariffs

28 AUG 2026 · 6 MIN READ

NEWS

The Netherlands: Europe’s Most Extreme Example of Grid Congestion

12 AUG 2026 · 19 MIN READ